Active Project List - Mobility & Traffic Engineering Division

Project Name Description Project Cost Funding Source Current Status Next Steps

Overland HFST Safety Improvements 

Installation of High Friction Surface Treatment (HFST) on curved segment of Overland Ave from Maytime Ln to Northgate St (0.17 mile).

 $677,000

CA Highway Safety Improvement Program (HSIP) Cycle 10

Out to bid

Council approval for construction contract - March 2026
Signalized Intersection Safety Improvements    Traffic signal modifications at 10 locations.  Improvements include new signal hardware, installation of protected left-turn phases, and implementation of leading pedestrian interval (LPI)

Locations are:
1.  Washington Blvd at Beethoven St
2.  Washington Blvd at Overland Ave
3.  Washington Blvd at Inglewood Blvd
4.  Culver Blvd at Sawtelle Blvd
5.  Overland Ave at Braddock Dr
6.  Overland Ave at Virginia Ave
7.  Jefferson Blvd at Hetzler Rd
8.  Centinela Ave at Green Valley Cir
9. Washington Blvd at Higuera St
$2,766,700 HSIP Cycle 10 In construction

Construction to be completed 06/2026

Unsignalized Intersections Safety Improvements    Safety improvements including addition of intersection lighting, installation/upgrade of stop signs and other warning and regulatory signs, and upgrade of intersection pavement markings at 12 unsignalized intersections on Washington Blvd, Sepulveda Blvd , Washington Pl, and Higuera St.  $1,545,700 HSIP Cycle 10
Construction complete  
Robertson Complete Street Project
Bicycle and pedestrian improvements along Robertson Blvd between Washington Blvd and Venice Blvd
$1,056,529 Metro Active Transportation (MAT) Grant
Construction complete  
La Ballona Creek Bike Path Improvements  Design and construction of sustainability, safety, and accessibility improvements on the segment of the La Ballona Creek Bike Path from Duquesne Ave to National Blvd (1.1 miles) including re-surfacing with permeable pavement, installation of solar powered lighting, enhancements to signage and pavement markings, accessibility improvements, and landscaping.
$2,800,160 Baldwin Hills Conservancy Grant - $1,952,500

Local Match - 847,660

In design

 
Continue with design


Better Overland Project

Design of pedestrian improvements, traffic signal at the library, and Class II and Class IV bike lanes on Overland Ave between Venice Blvd and the Transit Center (2.8 miles)

Phase 1 will add protected bike lanes, traffic calming measures, and pedestrian safety improvements along Overland Avenue between Venice Boulevard and Culver Boulevard.  Included is a new traffic signal at the Culver City Library.

Phase 2 will add protected bike lanes, traffic calming measures, and pedestrian safety improvements along Overland Avenue between the Ballona Creek and Freshman Dr (West LA College).

$6,367,700

Measure M Sub Regional Fund (WCCOG) - $842,496

Metro Grant (2028) - $5,000,000

Phase 1 - Construction

Phase 2 - Design

Phase 1 Council approval 1/26/26.  Go out to bid

Phase 2 - award design contract 1/26/29

Complete Streets Design Standards This project will prepare a comprehensive, community-driven Complete Streets Design Guidelines.   The Guidelines will identify complete streets elements and multimodal design improvements to enhance safety especially for the most vulnerable roadway users, including pedestrians, bicyclists, and transit riders, while still serving motorists $564,780 Sustainable Trans Planning Grant (Caltrans) - $500,000

Local Match - $6,000
Council adopted 6/23/25
Move Culver City - Eastern Segment Extend Move CC bus/bike lane corridor along Washington Blvd and Adams Blvd to Fairfax Blvd $1,769,643 Bus Line Fund, Street Pavement, Measure M Final plans approved 10/13/25 Construction contract awarded 1/12/26
Farragut Dr Bike Boulevard Project
Establishment of bike boulevard signage and pavement markings, traffic calming devices including speed cushions and traffic circle, ADA compliant curb ramps, and construction of missing sidewalk segments.  Farragut Dr between Overland Ave and Duquesne Ave
$1,500,000 (estimated)

Measure M - $250,000

Construction - Unfunded

Secure consultant contract

Begin design

Secure construction funding

Farragut Ped/Bike Connection Replacement Demolition of existing path and its replacement with permeable pavement, pedestrian-oriented lighting, a drinking fountain, new fencing, and an irrigation system for new plants and trees  $465,000  City CIP Project Complete
Safer Fox Hills Project

Implement Class II and Class IV bike lanes on multiple area streets, enhancements to signage and pavement markings, and implementation of traffic calming devices including speed humps, bulb outs and traffic circles.

Phase 1 will implement protected bike lanes, traffic calming, and pedestrian safety enhancements on Green Valley Circle, Buckingham Parkway, and Bristol Parkway.

Activities related to Phase 2—including additional community outreach, engineering design, and construction—will begin when construction of Phase 1 is substantially complete.

$1,100,000 Metro Measure M - $600,000

Parking Fund - $162,000

Fox Hills NTMP - $150,000

City CIP - $150,000

Phase 1 - In design

Phase 1 Final plan approval - March 2026
I-405 SB Ramps at Sawtelle Blvd/Matteson Ave  Traffic signal modification to allow for protected left turn movement at freeway off-ramp $146,947 Sony Mitigation Funds In construction

Complete construction 02/2026

Tri-School Area Mobility Study

Traffic study of tri-school area as part of Safe routes to School Program. Study will include extensive public outreach and community meetings and coordination with CCUSD and other stakeholders.

 $250,000  City CIP Study underway Plan for 2nd community, BPAC, Mobility Subcommittee meetings - March 2026
Arts District Parking Study Parking study along Washington Blvd within the Arts District $150,000

Unfunded

   
Bicycle and Pedestrian Action Plan Implementation
Implementation of the bikeways network as recommended by the 2020 BPAP.  Projects would be implement in segments and contingent on future funding.  

Segments include:
1 - Overland Ave btw Venice Blvd and Sepulveda Blvd (Class IV)
2 - Sepulveda Blvd btw Ballona Creek Bridge and Jefferson Blvd (Class IV)
3 - Sepulveda Blvd btw Jefferson Blvd and Centinela Ave (Class IV)
4 - Jefferson Blvd btw Sepulveda Blvd and Higuera St (Class IV)
5 - Centinela Ave btw W City Limit and Sepulveda Blvd (Class II)
6 - Centinela Ave btw Sepulveda Blvd and E City Limit (Class IV)
7 - Culver Blvd btw Elenda St and Duquesne Ave (Class II)
8 - Green Valley Cir (Class II), Bristol Pkwy (Class II), Buckingham Pkwy (Class IV)
9 - Sawtelle Blvd btw Venice Blvd and Braddock Dr (Class II)
10 - Sepulveda Blvd btw Venice Blvd and Braddock Dr (Class II)
11 - Washington Blvd btw Harter Ave and Overland Ave (Class II)

12 - Washington Blvd btw Hargis St and Adams Blvd & Adams Blvd to LA City Limit (Class II)

$10,000,000 (estimated)

Segments 3, 4, 6, 7, 9, 10, 11 - Unfunded

Segment 1 - Included with Better Overland Project

Segment 2 - $250,000 (from 11111 Jefferson Project)

Segment 7  -Mobility Fund

Segment 8 -  Included with Fox Hills NTMP

Segment 12 -Included with Move CC Eastern Segment.

Segment 12 -Council approval of construction bids 1/12/26

Segment 8 - Design progressing with Safer Fox Hills Project

Segment 7 - In Design

Segment 5 - complete

Pursue grants, local funding and development agreements to secure funding for all segments.

Segments 2, 3 - begin design 
Rancho Higuera NTMP - Phase 2 Neighborhood traffic calming plan currently under construction following the planning, design and community consultation. $348,000 Culver Studios Mitigation Study underway Plan for 2nd community meeting
Traffic Signal Battery Backup System Install battery backup systems at 10 locations each year, beginning with critical and complex intersection that serve a large volume of traffic.  $150,000 Measure M Installed 65 units Procure next round of purchases
Traffic Signal Synchronization Conduct traffic signal timing update at all of the City's signalized intersections.  Install additional limit line detection as necessary using video units at key intersections for traffic detection (vehicle, bicycle and pedestrian).  $200,000 LA County Prop C First Round Complete Select next corridor
East Washington Traffic Signal Fiber Optic Upgrades

Approximately 75% of the City's traffic signals are connected with copper twisted pair wiring.  Fiber optic cables will allow for all devices to function properly and without interruption.

Phase 1 Washington btw National and La Cienega; National between Washington and Eastham

 $300,000 Measure M In construction Construction to be completed May 2026
West Washington Traffic Signal Fiber Optic Upgrades Upgrade the existing twisted pair copper wiring at 20 signalized intersections west of the 405 San Diego Freeway   $400,000 Special Gas Tax  In Design Design to be completed by June 2026
New Parking Meter Installation  Install approximately 500 new parking meters in Hayden Tract and West Washington Blvd areas.  $150,000 Parking Fund  In Progress Coordinate with City crews for installation
Daylighting Red Curb Installation Install red curb at intersections citywide to comply with AB 413  $50,000 City CIP  In Progress Coordinate with City crews for installation