Overland HFST Safety Improvements
|
Installation of High Friction Surface Treatment (HFST) on curved segment of Overland Ave from Maytime Ln to Northgate St (0.17 mile).
|
$677,000
|
CA Highway Safety Improvement Program (HSIP) Cycle 10
|
Out to bid
|
Council approval for construction contract - March 2026 |
| Signalized Intersection Safety Improvements |
Traffic signal modifications at 10 locations. Improvements include new signal hardware, installation of protected left-turn phases, and implementation of leading pedestrian interval (LPI)
Locations are:
1. Washington Blvd at Beethoven St
2. Washington Blvd at Overland Ave
3. Washington Blvd at Inglewood Blvd
4. Culver Blvd at Sawtelle Blvd
5. Overland Ave at Braddock Dr
6. Overland Ave at Virginia Ave
7. Jefferson Blvd at Hetzler Rd
8. Centinela Ave at Green Valley Cir
9. Washington Blvd at Higuera St
|
$2,766,700 |
HSIP Cycle 10 |
In construction |
Construction to be completed 06/2026
|
| Unsignalized Intersections Safety Improvements |
Safety improvements including addition of intersection lighting, installation/upgrade of stop signs and other warning and regulatory signs, and upgrade of intersection pavement markings at 12 unsignalized intersections on Washington Blvd, Sepulveda Blvd , Washington Pl, and Higuera St. |
$1,545,700 |
HSIP Cycle 10
|
Construction complete |
|
Robertson Complete Street Project
|
Bicycle and pedestrian improvements along Robertson Blvd between Washington Blvd and Venice Blvd
|
$1,056,529 |
Metro Active Transportation (MAT) Grant
|
Construction complete |
|
| La Ballona Creek Bike Path Improvements |
Design and construction of sustainability, safety, and accessibility improvements on the segment of the La Ballona Creek Bike Path from Duquesne Ave to National Blvd (1.1 miles) including re-surfacing with permeable pavement, installation of solar powered lighting, enhancements to signage and pavement markings, accessibility improvements, and landscaping.
|
$2,800,160 |
Baldwin Hills Conservancy Grant - $1,952,500
Local Match - 847,660
|
In design
|
Continue with design
|
| Better Overland Project |
Design of pedestrian improvements, traffic signal at the library, and Class II and Class IV bike lanes on Overland Ave between Venice Blvd and the Transit Center (2.8 miles)
Phase 1 will add protected bike lanes, traffic calming measures, and pedestrian safety improvements along Overland Avenue between Venice Boulevard and Culver Boulevard. Included is a new traffic signal at the Culver City Library.
Phase 2 will add protected bike lanes, traffic calming measures, and pedestrian safety improvements along Overland Avenue between the Ballona Creek and Freshman Dr (West LA College).
|
$6,367,700 |
Measure M Sub Regional Fund (WCCOG) - $842,496
Metro Grant (2028) - $5,000,000
|
Phase 1 - Construction
Phase 2 - Design
|
Phase 1 Council approval 1/26/26. Go out to bid
Phase 2 - award design contract 1/26/29
|
| Complete Streets Design Standards |
This project will prepare a comprehensive, community-driven Complete Streets Design Guidelines. The Guidelines will identify complete streets elements and multimodal design improvements to enhance safety especially for the most vulnerable roadway users, including pedestrians, bicyclists, and transit riders, while still serving motorists |
$564,780 |
Sustainable Trans Planning Grant (Caltrans) - $500,000
Local Match - $6,000
|
Council adopted 6/23/25 |
|
| Move Culver City - Eastern Segment |
Extend Move CC bus/bike lane corridor along Washington Blvd and Adams Blvd to Fairfax Blvd |
$1,769,643 |
Bus Line Fund, Street Pavement, Measure M |
Final plans approved 10/13/25 |
Construction contract awarded 1/12/26 |
Farragut Dr Bike Boulevard Project
|
Establishment of bike boulevard signage and pavement markings, traffic calming devices including speed cushions and traffic circle, ADA compliant curb ramps, and construction of missing sidewalk segments. Farragut Dr between Overland Ave and Duquesne Ave
|
$1,500,000 (estimated) |
Measure M - $250,000
Construction - Unfunded
|
Secure consultant contract
|
Begin design
Secure construction funding
|
| Farragut Ped/Bike Connection Replacement |
Demolition of existing path and its replacement with permeable pavement, pedestrian-oriented lighting, a drinking fountain, new fencing, and an irrigation system for new plants and trees |
$465,000 |
City CIP |
Project Complete |
|
Safer Fox Hills Project
|
Implement Class II and Class IV bike lanes on multiple area streets, enhancements to signage and pavement markings, and implementation of traffic calming devices including speed humps, bulb outs and traffic circles.
Phase 1 will implement protected bike lanes, traffic calming, and pedestrian safety enhancements on Green Valley Circle, Buckingham Parkway, and Bristol Parkway.
Activities related to Phase 2—including additional community outreach, engineering design, and construction—will begin when construction of Phase 1 is substantially complete.
|
$1,100,000 |
Metro Measure M - $600,000
Parking Fund - $162,000
Fox Hills NTMP - $150,000
City CIP - $150,000
|
Phase 1 - In design
|
Phase 1 Final plan approval - March 2026 |
| I-405 SB Ramps at Sawtelle Blvd/Matteson Ave |
Traffic signal modification to allow for protected left turn movement at freeway off-ramp |
$146,947 |
Sony Mitigation Funds |
In construction |
Complete construction 02/2026
|
|
Tri-School Area Mobility Study
|
Traffic study of tri-school area as part of Safe routes to School Program. Study will include extensive public outreach and community meetings and coordination with CCUSD and other stakeholders.
|
$250,000 |
City CIP |
Study underway |
Plan for 2nd community, BPAC, Mobility Subcommittee meetings - March 2026 |
| Arts District Parking Study |
Parking study along Washington Blvd within the Arts District |
$150,000 |
Unfunded
|
|
|
Bicycle and Pedestrian Action Plan Implementation
|
Implementation of the bikeways network as recommended by the 2020 BPAP. Projects would be implement in segments and contingent on future funding.
Segments include:
1 - Overland Ave btw Venice Blvd and Sepulveda Blvd (Class IV)
2 - Sepulveda Blvd btw Ballona Creek Bridge and Jefferson Blvd (Class IV)
3 - Sepulveda Blvd btw Jefferson Blvd and Centinela Ave (Class IV)
4 - Jefferson Blvd btw Sepulveda Blvd and Higuera St (Class IV)
5 - Centinela Ave btw W City Limit and Sepulveda Blvd (Class II)
6 - Centinela Ave btw Sepulveda Blvd and E City Limit (Class IV)
7 - Culver Blvd btw Elenda St and Duquesne Ave (Class II)
8 - Green Valley Cir (Class II), Bristol Pkwy (Class II), Buckingham Pkwy (Class IV)
9 - Sawtelle Blvd btw Venice Blvd and Braddock Dr (Class II)
10 - Sepulveda Blvd btw Venice Blvd and Braddock Dr (Class II)
11 - Washington Blvd btw Harter Ave and Overland Ave (Class II)
12 - Washington Blvd btw Hargis St and Adams Blvd & Adams Blvd to LA City Limit (Class II)
|
$10,000,000 (estimated)
|
Segments 3, 4, 6, 7, 9, 10, 11 - Unfunded
Segment 1 - Included with Better Overland Project
Segment 2 - $250,000 (from 11111 Jefferson Project)
Segment 7 -Mobility Fund
Segment 8 - Included with Fox Hills NTMP
Segment 12 -Included with Move CC Eastern Segment.
|
Segment 12 -Council approval of construction bids 1/12/26
Segment 8 - Design progressing with Safer Fox Hills Project
Segment 7 - In Design
Segment 5 - complete
|
Pursue grants, local funding and development agreements to secure funding for all segments.
Segments 2, 3 - begin design
|
| Rancho Higuera NTMP - Phase 2 |
Neighborhood traffic calming plan currently under construction following the planning, design and community consultation. |
$348,000 |
Culver Studios Mitigation |
Study underway |
Plan for 2nd community meeting
|
| Traffic Signal Battery Backup System |
Install battery backup systems at 10 locations each year, beginning with critical and complex intersection that serve a large volume of traffic. |
$150,000 |
Measure M |
Installed 65 units |
Procure next round of purchases |
| Traffic Signal Synchronization |
Conduct traffic signal timing update at all of the City's signalized intersections. Install additional limit line detection as necessary using video units at key intersections for traffic detection (vehicle, bicycle and pedestrian). |
$200,000 |
LA County Prop C |
First Round Complete |
Select next corridor |
| East Washington Traffic Signal Fiber Optic Upgrades |
Approximately 75% of the City's traffic signals are connected with copper twisted pair wiring. Fiber optic cables will allow for all devices to function properly and without interruption.
Phase 1 Washington btw National and La Cienega; National between Washington and Eastham
|
$300,000 |
Measure M |
In construction |
Construction to be completed May 2026 |
| West Washington Traffic Signal Fiber Optic Upgrades |
Upgrade the existing twisted pair copper wiring at 20 signalized intersections west of the 405 San Diego Freeway |
$400,000 |
Special Gas Tax |
In Design |
Design to be completed by June 2026 |
| New Parking Meter Installation |
Install approximately 500 new parking meters in Hayden Tract and West Washington Blvd areas. |
$150,000 |
Parking Fund |
In Progress |
Coordinate with City crews for installation |
| Daylighting Red Curb Installation |
Install red curb at intersections citywide to comply with AB 413 |
$50,000 |
City CIP |
In Progress |
Coordinate with City crews for installation |