The following procedures have been established as the City's Neighborhood Traffic Management Program (NTMP) process by the City Council effective November 22, 2024.
The following initials indicate who is responsible for completing the various Phases discussed below:
Public meeting and residents' committee formation (C): The Engineering Division will mail an invitation to the whole neighborhood to participate in a meeting of area residents to discuss the NTMP and form a Residents' Committee. Information notice of neighborhood meetings will also be provided to businesses located immediately adjacent to the study area.
Development of Traffic Control Plan (NC): The Engineering Division and Residents' Committee will work together at open public meetings to complete the steps in developing a proposed traffic control plan:
Evaluation of alternatives and selection of proposed plan (NC): participation by Residents' Committee, all affected City Departments and Divisions, and other affected agencies.
Advisory survey for test installation of proposed plan (C): The Engineering Division shall mail an advisory survey to all residents to the study area. The trial installation shall be supported by at least 60% of all those who participated and the total number of returned surveys shall represent at leas 50% + 1 of the total households in the study area before the request for trial installation can be forwarded to the City Council for consideration.
For neighborhoods in the City requesting the trial installation, which have gated residential developments, the individual duly designated Homeowners Association or Resident Association may submit an advisory survey on behalf of their individual gated development, provided they submit written proof that they are authorized to act on the matter on behalf of the households in the development. Provided valid proof is submitted, each such development would then be considered as a single household for determining support or trial installation.
Request to City Council for permanent installation (NC): If the resident survey attains the required thresholds, the plan is sent to City Council for approval, modification, or rejection.
Public Works Department
Mobility & Traffic Engineering Division
traffic.engineering@culvercity.org (310) 253-5634