Project Overview

The Public Works Department Engineering Division is mobilizing for the Veteran's Memorial Park Parking Lot Pavement Rehabilitation Projec (Project).

The Veteran's Memorial Park Pavement Rehabilitation Project will involve removing 2 to 3 inches of deteriorated asphalt concrete at various locations in parking lots in and around Veterans Park and then repaving or adding new rubberized asphalt concrete (resurfacing). Damaged curb, gutter, and sidewalks will be replaced where necessary. Parking lots will be restriped following resurfacing. 

Located along Culver Boulevard between Overland Avenue and Elenda Street are five city owed parking lots originally constructed in the 1980's to service the Veteran’s Memorial Building and Veteran's Memorial Park. These well used parking lots are maintained regularly by Public Works street crews but the surface has degraded over time and they are now in needed of resurfacing. Two of the parking lots between Coombs Avenue and Elenda Street were resurfaced with slurry seal in 2025. In 2026, the City will resurface with slurry seal the remaining parking lots along Culver Boulevard. With application of the slurry seal treatment, the City anticipates extending usable surface life of these parking lots for an additional 10-15 years.

The City will also resurface the parking lot adjacent to the Teen Center. The Teen Center is located on Overland Avenue between the Veteran's Memorial Building and Culver City Pool. The Teen Center parking lot hasn’t been resurfaced since its original construction in the 1960's. Due to extensive asphalt pavement damage from tree roots and long-term usage, a deeper grind and full paving of the parking lot is recommended.

Review DRAFT Project Specifications(PDF, 1MB).

Review Project Exhibits(PDF, 494KB)

View Official Courtesy Notification regarding Imminent Construction


Construction Schedule & Location

Please be advised, all construction is dynamic and the schedule is subject to change.

Dates: Spring - Summer 2026

Regular Hours
:  Monday - Friday from 8:00 AM - 5:00 PM

Location
: Parking lots in and around Veteran's Park


Construction Impacts

Every effort will be made by the City and the Contractor to minimize inconveniences.

  • Impacted parking lots will be closed temporarily.
  • Sections of traffic lanes along adjacent streets may be closed temporarily. 
  • Residents may experience temporary loss of street parking and construction noise, dust, etc.

On trash pick-up days, continue to place trash containers in the street as usual.

Observe all traffic controls, parking restrictions, and traffic control workers.  

View Notice to Residents regarding the Veteran's Memorial Park Parking Lot Pavement Rehabilitation Project.


Project Funding

Coming soon.


Sustainability Impact

Coming soon.